
20 Easily dredged 10–20 Moderately dredgeable 1–10 Hard digging 1 Dredgeable R1.5 (Not encountered) R1 to R1.5 Dredgeable R1.5 Hard

1. A dredge cutterhead (20) comprising: a (30) of at least 10% such that a net forcea different radius of curvature R1, R2 and R3

Five papers constitute this Session 1 section of the proceedings of the 12th World Dredging Congress. The topic of the session was Dredging Management.

sites, probably due to recent dredging activity. (km)Significant Height of source (m)Water r1r.(3SEAJE.0..CCSP.WP.GA,BR,RR,BW Bank

Yorktown Naval Weapons Station, Dredging Pier #R-3 : environmental impact statement

(D) Gastropods 6 5 4 3 R1 R2 2 1 (E)225 cm2 core from the mudflat at three (Grassle and Grassle, 1974), dredging for a

location of a minor diamond mining company in Luderitz district, South-West Africa.Springer Berlin Heidelbergdoi:10.1007/978-3-540-72816-0_6223

20 Easily dredged 10–20 Moderately dredgeable 1–10 Hard digging 1 Dredgeable R1.5 (Not encountered) R1 to R1.5 Dredgeable R1.5 Hard

dredging operations that were in progress at the 4 .5 2 3 .5 2 2 .5 2 1 .5 2 0 .5r1 1143-66 r2 1143-67 1143-68 1143-69 1143-

Yorktown Naval Weapons Station, Dredging Pier #R-3 : environmental impact statement

dredging operations that were in progress at the 4 .5 2 3 .5 2 2 .5 2 1 .5 2 0 .5r1 1143-66 r2 1143-67 1143-68 1143-69 1143-

= R1 (Simmonds, Dolman et al. 2003) R1 is water depth (km); R is There were at least two kinds of noises from the dredging platform, the

sites, probably due to recent dredging activity. (km)Significant Height of source (m)Water r1r.(3SEAJE.0..CCSP.WP.GA,BR,RR,BW Bank

DREDGING INSTRUMENTS 1971-12-21 Van der Veen 37 including at least one suction nozzle, an R1 connected to the signal circuit, and two